Answer Posted / b.srinivasa rao
ALL THE ABOVE ARE WRONG ANSWERS
SUPER STRUCTURE IS REST ON ABOVE THE PILE CAPS AND ABUTMENT
CAPS, i.e GIRDERS,SLABS,FOOTPATHS AND CRASH BARRIERS
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
why do we not deduct volume of steel to find actual volume of concrete in practical???
Form where IS456 is adopted in 1978?
Dear Sir What is the Contraction joint for base Slab
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
What is critical path method (c.p.m)?
why is M30 grade Concrete use for Foothing & Column M50
what is modular brick and it size
.5Ast
why is the column design?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
what is right & short method of measurement of slab&beam
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
may i know the detailed description of cutting length