How do we calculate the building footing calculation ?
Answer Posted / guest
Dear friends generally we do this footing calculation like
this two method =
(A)1st method =i)1.500 m x 1.500 m x 0.500 m = 1.13 Cum.
ii)½ x ( 1.500 m + 0.250 m ) x 1.500 m x 0.200 m = 0.260
Cum. (B)2nd Method =i)(1.500 x 1.500 x 0.200)+ (0.250 x
0.250 x.0.250)= 0.460 Cum.
ii) ( 1.500 x 1.500)+ ( 0.250 x 0.250)/2 x 0.200 = 0.231
Cum.
( But I think it is not proper procedure so please you do
properly )
| Is This Answer Correct ? | 10 Yes | 33 No |
Post New Answer View All Answers
Differentiate first angle & third angle projection?
what is the difference between replacement of cement by groundnut shell ash
material used for mendrel use to bend epoxy coated rebar
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
how we check the thickness and line of ceiling plaster.
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is oneside mat. And explain
Please design 12.5m long dubbly beam
what is the use of water bar in water tank and is this an extra item in estimate?
to minimize budget cost of building , what can i do
Exterior Joints,define
what is m30 in concrete tiles