How do we calculate the building footing calculation ?
Answer Posted / guest
Dear friends generally we do this footing calculation like
this two method =
(A)1st method =i)1.500 m x 1.500 m x 0.500 m = 1.13 Cum.
ii)½ x ( 1.500 m + 0.250 m ) x 1.500 m x 0.200 m = 0.260
Cum. (B)2nd Method =i)(1.500 x 1.500 x 0.200)+ (0.250 x
0.250 x.0.250)= 0.460 Cum.
ii) ( 1.500 x 1.500)+ ( 0.250 x 0.250)/2 x 0.200 = 0.231
Cum.
( But I think it is not proper procedure so please you do
properly )
| Is This Answer Correct ? | 10 Yes | 33 No |
Post New Answer View All Answers
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
what is the hanekom repairing material after concreting work
Define current ucs?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is the exception critarea of cube?
what is the most suitable foundation when construct a bird watching tower in a marshy land
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
In a concrete grade C35A, C & A stands for what and equalent cube strength?
how much repeitation for conventional and maivan formwork?
What do we mean by partial moment release ??
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com