How much percent dry volume consider for concrete
Answer Posted / er.s.a.masoodi
152%
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
How many square meter can a worker/labor demolish a structure per day?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is the cost difference between site mix and ready mix concrete per cubic meter
why +1 to be followed for calculating the no of bars in BBS. Please explain
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is the Hardness of M-40 grade concrete, general and theoratical
sir please send me campus placement questions in civil engineering
what is the difference between replacement of cement by groundnut shell ash
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is the diff between cad & cadd?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Explain what is zoning permit?
how can we construct building without foundation providing only grade beam at ground level
Test procedure of fly ash bricks as per code ?