Answer Posted / er.s a masoodi
2400kg/m3
| Is This Answer Correct ? | 28 Yes | 1 No |
Post New Answer View All Answers
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
How much cement and sand required for 9"brick wall per square metre
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is the outturn of Ceiling plastering
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Floor tile measurement? Wall to wall or skirting to skirting
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Spider cracks occur in beam bottom due to––
though u r a civil engineer, y r u interested in tcs???
Explain what are the phases inspections are done by local authority while construction?
whats is difference between anchorage length and development length
What is the per cu. mt. price of ready mix in Gujarat region.?