we r having 3 core 3 1/2, 4 core cables how we can know
this cable has to be used for this purpose?
Answer Posted / at
3 core cables are used where ever the system is ungrounded.
3.5 core cables are used where the major load in an
industry / plant etc. is three phase but also has single
phase loads or loads that can cause a little unbalancing
and thus the nutral might carry some current but not always
and not as much as the line current. Therefore a smaller
cross section of nutral can solve the purpose as current
through nutral will be very small as compared to the rated
current of the cable.
4 core cables are used in systems where all loads are
single phase or majority loads are single phase. so there
are chances of high degree of unbalancing. and nutral has
to carry a larger amount of current.Therefore half cross
section of nutral may not solve the purpose and we opt for
4 core cables. This arrangement is used for small cross
section cables used in homes and industries. for lighting
and other small applications.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What are the specifications for getting approval of Substation?
How to measure the earth resistance value in a concrete pavement(flood light area)?
What is the difference between amorphous core transformer and CRGO core transformer?.
who invented active elements? plz give me the complte details of active elements...
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?
11000volt DG set carnt kaise banvay
what is the difference between the characteristics of two different phase bushing of any transformer
please forward me the type of questions which would rise while me attending to 33KV Electrical License to my mail ID:vadrevu_raghava@yahoo.co.in
After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?
What is 11 N1 and 12 N2 in single phase Transformer ?
Why can't we take NO LOAD TRIAL of motors having V1 mounting??
What do you mean by a voltage transformer?
Block diagram of Power line communication?