Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

MCB Rating

Answer Posted / rajiv mahajan

.5amp to 100 amps
single pole, double pole , triple pole , triple pole with
netural , four pole

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

2738


WITCH CARDS IN USE IN FIRE CONTROL PANEL.

1973


What is the unit of charge and current?

1206


what is PID control in VFD drives?

2068


how technical is calculated in 11kv line and lt line

2144


What do you mean by a current transformer?

1147


How many methods use the load flow solution?

1410


hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects

2053


i am going to attaned the engineer (disign)iterview at HAL please give me duid line

2329


How dia computation perfomed in cold rolling mills .

3111


Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors

1952


Rules and standards of electrical control wiring ?

1220


why the arc welding machines require parallel earthing systems? ie why each machines are connected to earth pit by separate wires during earthing? wats it adavantages?

2264


HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS

1940


why transmission is only 3 phase and not 2 or 4 or poly phases

2183