WHEN SINGLE PHASE SUPPLY AS 220V, WHY THE 3 PHASE- 4 WIRE
MEASURED AS 440 VOLTS INSTEAD OF 660 VOLTS (220 VOLTS PER
PHASE i.e 220x3 = 660 volts ).
Answer Posted / rajiv mahajan
ac has frequancy. each phase goes maximum ,minimum and zero
in 50 times in a second. if you see ac phase cycle. you
can understand this as this way our alternator each phase
winding is placed at 120 degree.
Is This Answer Correct ? | 2 Yes | 13 No |
Post New Answer View All Answers
What is icu and ics in Acb and how many time icu or ics passes from breaker?
what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me
what is Different between Bilinear and Unilenier?
How to control motor gearbox speed and friquency? If length of cable and dia given, how to measure the voltage drop?
Write the programming software name for LG, SIEMENS,Messung,AB
Explain the operation principle, advantages and disadvantages of the following converters: a) A 12 pulse converter b) A Switch-mode inverter c) A thyristor inverter
R=*ΒΆ l/a
What do you mean by cogeneration? What its working principle?
How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.
Air refrigeration cycle works on the
What is making & breaking current ???
What is effect on in zone and out zone fault if CT chosen for phase side is Vk/2<5mA and Neutral side is Vk/2<15mA on REF protection of Transformer
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
anyone please send transformer parameter design formulas & details of tap changer ? plz i have interview this week its more helpful for me ?
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?