Answer Posted / guest
boiler,heater,condenser,water flow pipes,steam
generator,pumps etc....
| Is This Answer Correct ? | 16 Yes | 10 No |
Post New Answer View All Answers
What is the use of flash chamber in a vapour compression refrigeration cycle to improve the cop of refrigeration cycle ?
What do you understand by fuel cycle in nuclear plants ?
Why do you want to leave your last job?
What are orthotropic materials ?
Out of constant pressure and constant volume lines on ts diagram which line has higher slope ? And whether slope is constant or variable ?
What are the advantages of white metal?
What is curie point ?
What is the difference between isentropic process and throttlinglprocess ?
Sir, I have applied for the of section engineer at RRB chennai. please send me all RRB-chennai solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible.
time vS speed Graph for mechanical press?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is the relation between the thickness of the thermal boundary layer and the depth of the hydrodynamic boundary layer?
What is forced convection?
one kg of gas is compressed adiabatically from 1 kg/sq.cm,1 cubic metre volume and 300 kelvin to 5 kg/sq.cm,0.5 cubic metre and 400 kelvin.work transfer in this process will be
I need BHEL apptitude questions