Answer Posted / sintha sheik mathar as
To define the bearing capasity of soil and settlement for
foundations, before implementing the job site for factor of
safety as per design.
| Is This Answer Correct ? | 60 Yes | 14 No |
Post New Answer View All Answers
How you can use different dimension tools in cad? What are the different dimensions available?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
procedure for preliminary selection of size of column of 5 storey building
What are new methods /technologies of pothole patching?
How much does the leaning tower of pisa lean?
What is construction mitigation management?
What is the difference between Grade I, II and III of GSB?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
what is the difference b/w full length and cutting length?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Questions related to civil.engg in company
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument