i want to Measure the Difference pressure of Packed distillation Column of height 3 mtr. h.p. side connected to
bottom & L.P. side connected to the top , so tell me what
will be THE URV & LRV of that D.P. transmitter?
Answer Posted / jaspreet grewal
URV = 0 mm WC
LRV = -3000 mm WC
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What do you know about gail?
What is the procedure of calibration of Load cell?
what will the sending unit in the fuel gauge utilizes?
How to find out the current of two motors having same power consumption but different RPM?
in differential pressure transmitter,min&max pressure range for hp&lp
what is intrinscily safe system and where we use?
Actual using of tube bender to bend 2 opposite 90 deg at correct measurement center to center of tubing.
Whatis the reset ofset and control system in instrumentation
How the sizing of the analog signal cable is calculate?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Calibration procedure for Electro magnetic Flow meter
HOW TO CHOOSE FREAQUENCY IN FMCW TYPE RADAR INSTRUMENTS. DESIGN BASIS OR DESIGN CALCULATONS ?
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
What is the difference between conductive lined pipe and conductive unlined pipe? Why do we see that?
on interface level transmitter model(RTG3302-EMERSON) What is threshold valve how can we select correct threshold value T1,T2,T3,T4 When interface water & hydro carbon