Re: What do you mean by Power factor of a generator? Power
factor purely depends on the load (wether inductive,
reactive or unity) then what does the Power factor
mentioned on the generator nameplate means?
Answer Posted / k.prakashchandra
The pf mentioned on the name plate is for design purpose.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
What is dc current source? Differentiate between ideal and non ideal current sources?
What is the working principle of servo motor? And explain it.
How cable from Kit-Kat to main switch, from starter to motor are designed?
Two bulbs of 100w and 40w respectively connected in series across a 230v supply which bulb will glow bright and why?
What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?
Why derivative controller is not used in control systems?
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
whit is 33kv power 300*300 cable full current with formula
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
write encoder 17 pins details? pin a;b+, pin b;w+,..pin s & t. what is the meaning of b+, w+? explain;
Explain M Var? Which types of problem occurs when reactive power increase at the time of full load of plant and at the time of synchronize of plant?
What is EHT tariff or Power factor Tariff ????
Which device of PlC does share load between DG sets when DG are running in perallel?
what will be project cost for 100 kv transformer connection under oyt scheme.