four jobs j1,j2,j3 and j4 are waiting to be run. Their
expected runtimes are 9,6,3 and 5 respectively. In order to
minimize average response time, the jobs should be run in
the order:
a) j1j2j3j4
b)j4j3j2j1
c)j3j4j1j2
d)j3j4j2j1
Answer Posted / mann
j3,j4,j2,j1
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
What is Campus selection process of patni at Adcet,Ashta at 24th dec 2010.Also give apti syllabus.
What is the instruction to load the register B?
what is mean by oracle?And how it is used?
i opt cse branch in engineering.which subject i have choose in civil service preliminary examination
What is the purpose of dampening roller
i m doing engg in IT .for getting job which courses i have to do?
if u have question papers/sample papers of any of PSUs,plz send me at dinesh.pandey3@gmail.com
how to join two table those stored on different database.
what is defect tracking in sotware testing
Given a number (N), program to check whether its binary form has periodic or not
is it possible to get u.s visa with 55% in b-tech and 15 backlogs
3. Tell me about a time when you had too many things to do and you were required to prioritize your tasks.
what is isolator
how the aeroplane protected from the lightening?
i want to know about the scope of IT engineers in ONGC