four jobs j1,j2,j3 and j4 are waiting to be run. Their
expected runtimes are 9,6,3 and 5 respectively. In order to
minimize average response time, the jobs should be run in
the order:
a) j1j2j3j4
b)j4j3j2j1
c)j3j4j1j2
d)j3j4j2j1
Answer Posted / mann
j3,j4,j2,j1
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
What is the dewpoint of atmoshperic Air?
sir i m reject two time in u.s in spring intake now im taking a date of 1july-2010 in fall intake &im competed my bachlor degree(chem) in jun-2009 so what answer i give to visa officer ask me a what r u doing last 1-year bcoz i have no work expirience
What type of questions are asked in interview?
what is the need for oobs
What are the frequently asked technical engineer ques?
What is the key element of Defect Report and Test case format?
Can you connect Active Directory to other 3rd-party Directory Services? Name a few options.
what is the formula/ ratio for hollow block? considering to a 40 kgs of portland cement.
WHAT ARE THE ADVANTAGE OF SYSTEM ENGINEER
2. A product selected for testing is equally likely to have been produced by one the 6 machines/processes. (i) Determine sample space āSā (ii) What is the probability that the product is from machine 1? (iii) What is the probability that the product is from machine 2 or machine 4? (iv) What is the probability that the product is from both machine 5 and machine 3? (v) What is the probability that the product is not from machine 6? (vi) What is the probability that the product is not from either machine 6 or machine 1?
need tcs questn papers from 2007 to 2009 plzzzmail to 9015.rama@gmail.com its urgent
postfix expression for x^y^z-m+n+p/q ?
what does static variable mean in c language?
project plan for bug tracking system?
How is the parity flag actually set in the 8085 microprocessor?