Answer Posted / yaswanth kumar
Lapping work means its an extension of steel bar to high or
in length by providing bend to the jointing bar and firmly
tieup with the previous bars.
Minimum overlapping length is 50 times of the dia of the
Bar
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What are some facts about concrete?
which steel is better for residential building tmt steel or hysd steel
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What is the density of DLC & PQC and how it is differ from normal concrete?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is thumb rule for deep trench excavation
yasser arfatcompleted his degree in civil from which university
Which type of plywood & sizes using in construction projects ?
may i know the detailed description of cutting length
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
how to nfind out the specific gravity of sand.aggregate,water please help...