Is it necessary to seperate the DG earth grid with
Electricity Board earth grid for protecting the DG set.
if yes why?

Answer Posted / k.prakashchandra

To avoid harmful voltages due to loose connection and line
earth faults

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CALCULATE CAPACITOR BANK OR HARMONIC FILTER CALCULATION

1775


percetans

1701


why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?

1383


Whether it is possible to measure energy at the input of rectifier transformer (12 pulse with very high odd harmonics)

1458


what is the ms flat constant for calculating earth mat design calculation?

2003






What is transformation ratio what it describes?

1159


Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?

1797


Meaning of ingrace protection for motor.for ex IPXY

2332


How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.

1608


how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.

1753


what is V.L.F. testing of power cable? do you know the voltage ratings, like for what rating and size of cable what rating of V.L.F. testing is used?

1880


Why 3 phase induction motor getting supply in body if one of it's phase is cut

1262


the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?

1623


we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input

1651


concept of busbar and load dispatching..?

1916