Answer Posted / ysr
generally beetween 0.4 to 0.7
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
what mean By core Billing
How to do base isolation for RC framed structure using ETABS software?
what is that one cub metre plaster in cemant and fine sand
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what is the difference b/w full length and cutting length?
specifications of fe500 steel
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Volume of 25kg putty bag & 40 kg putty bag volume??
what will be price of 1:2:4pcc per kg?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
How to come 1.54 from dry to wet concrete?