Answer Posted / ayush
consider grid as a load for time beiing nw if while a
sudden load is applied on alternator there will b large
drop in speed momentrily due to its synchronous behaviour
torque angle will increase to increase the devloped torque
to cope wth load torque suppose there was no little speed
increament in that case large load causes large hunting so
to avoid large oscilaation that r difficult to damp small
increase in speed of turbine is done so built required load
torque wthout loss of synchronism due to hunting even
though there will b oscillation but due to increase in
turbine speed r much less so can b easily damped by damper
windings.
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Why we use ups battery and dsdb battery in thermal power plant
operation of diesel generator
thyristor controlled APFC panel design parameter?
Why is a synchronous motor always star connected??
Give details on how you intend to handle a challenging position you are posted to manage unexpectedly as a company staff?
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?
WHaT IS THE CONCEPT OF INDUCTION LAMPS IN MODERN LIGHTINGS, and HOW IT WORKS TO EMIT LIGHT ( AS NO ELECTRODES ARE PRESENT ) ?" COULD INDUCTION LAMPS CAUSE INTERFERENCE WITH COMUNICATIONS INTO A STORE USING INDUCTION LIGHTING ? WHAT IS THE BENEFIT OF USING THE LOW FREQENCY INDUCTION LAMP , VERSUS LED , AND VERSUS FLUORESCENT, AND VERSUS ANOTHER KIND OF LIGHTING . THANK yOU MOISES GUINDI
What was the Dg set radiator and lube oil temperatures trip in ACB
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
what is mean by D.O. in distribution line poles?
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?
how many safety really of DG sets.
1600kva capacity Transformers how the bucholz relay,Oil temperature,winding,surge relay relays setting are to be done
What is the percentage loss for aluminium wire for HT line more than 11KVa