i have faced this question in one interview.kindly let me
know if u know the ans . the ques is
the tester have been found 20 bugs in the requirement .after
dev. has been fixed 20 bugs again tester retest the bugs he
found again 12 bugs dev .fixed 12 bugs keep on its going
..finally its comes zero defects now how will u checking the
application stability ..
Answer Posted / saff
an application is said to be stable if the application is
producing very minimal amout of erros then it was producing
in the begining of the developement
if we do regression testing we will know how manybugs are
there in whole application so
if we have lot of bug then application is not stabel
but if we have very minimal number fo bugs then the
applicationis said to be stable
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What r the documents required for performance testing
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
Artifacts in design phase of SDLC ?
Can you explain tailoring?
Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks
how to clarify functional requirements and non functional requirements in a srs?
What type of metrics would you use?
What is a bug triage?
Hi,friends i am going to write ICST certificate exam on augest.So can anybody post some of sample qusetions for ICST certificate exam.Really it will be useful for me
What are the Important test scenarios which can be used for testing a web site?
Build with fixes has been deployed on QA environment if asked by your manager to reproduce how can you reproduce the issues? (by using the previous build) Can you access the previous build? If so ,what are the tools or how can you access?
1.What types of documents would you need for QA, QC, and Testing?
write test cases on wall
What is state transition?
when do you escalte issue to your manager?