Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / r. ansari
Formula for trapezoidal footing quantity
Q = h/3{(a+b)+√ab}, a&b is area of bottom and top portion
=0.5/3{2x1.7+0.15x0.15+√3.4x0.0225}
=0.583 Cu.m.
| Is This Answer Correct ? | 11 Yes | 10 No |
Post New Answer View All Answers
I have an span length 16 ft c/c
What is kn measurement?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
what is the construction cost for per cft of multistorryed building in kolkata?
How to compute minimum number of columns required for a site from area of site?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How much cum. Brick work can do by 1 madon
What is the tensile strength of wood?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
what is civil enginnering & what you need of this course?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is kribs is supporting?