Answer Posted / itsme
13Nos.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
why demand factor less then 1 ?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
In reclamation works what are the importance of geotextiles and sand?
What is absolute pressure? How absolute pressure is calculated?
Aptitude, reasoning, quants, verbal and technical question
Will water damage concrete?
What is gravity flow?
what is the list of building construction equipment & teir output?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the procedure of concealed plumbing in toilets?
what is called the inverd level of mabhole chamber?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.