how can we measure 220kv or more than these voltages ...?and
also how can we conform whether we r getting 220kv from
generating stations throuth the h v transmission lines?
Answer Posted / k.prakashchandra
With PT and it is reliable.It is the only way for measurement
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is formula calculation size cable wire ?
Dear Mr B C pal...Can you plz. put some light on principle of operation of Z-Ct in conjunction to its use with 1Cx1000Sqmm HT Cables & Directional Ground Fault / Over Voltage Relays...Regd..Parag v K 9899115632
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?
Difference between transition and diffusion capacitance
state basic meaning of 'INDUSTIAL AUTOMATION'?
how to put cable sizing and cable glands size for respective cable & Cable Lug size in a DB sectors???
What is FM200 Gas??Applications........
How to check the Bushings of the transformer?
What are all present producing cost of Per KWH of various Fuel?
HOW TO CALCULATE HV CABLE SIZING?
what is package substation.how many types they have
If you have an earth with pilecap then your resistance is really low. why and how?
exolain the star delta connection
why i can not use thimble on capacitor duty contactor
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)