what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?

Answer Posted / vishal rana

Ratio=1:2:4(cement:fine
agg.:coarse agg.)
Sum of the ratio=1+2+4=7.

Total dry mortar for 1cum
cement conc.=1.54(it is fixed)
There for=1.54/7=.22cum

Then quantiy of,cement=.22 into
28.8=6.24 bags.

Sand=.22 into 2(ratio of
sand)=.44cu m.
Aggregate(shingle or bajri)=.22
into 4=.88 cu m.

Materialr for 1cum cement conc.
1:2:4.
Cement=6.24bags
Sand= 0.44cum
Agg.=0.88cum

Is This Answer Correct ?    47 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how u design STAGING for Superstructure in BRIDGE construction?

1892


what could be the production cost of 1 cum of concrete by CP30 plant

1272


How to decide/consider the grade of bitumen for dbm.

1765


how to nfind out the specific gravity of sand.aggregate,water please help...

1685


I need old MMUP exam question and answer for Civil engineering

1155






according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1308


How is the strength of cement measured?

708


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2047


what is the theoritical percentage of concrete cubes testing per day?

4389


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1292


How do you calculate the power of centrifugal pump?

647


what r the precaution for high in atp tempareture,low in atp tempareture

1580


how we calculate the grade of the Bituminous materials.?????

1823


i want texture painting pwd data

1641


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1646