How do you find the weight of rod per metre lenth ?
Answer Posted / kumaresh
D^2/162
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
procedure for preliminary selection of size of column of 5 storey building
What is the purpose of the gap in the road on this bridge?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How cracks in concrete can be avoided?
what is labour consume factor in residential projects
what is detail procedure of eccentric footing? plz. give solved exmple?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
I need to constructive work in amaraj batteries
why demand factor less then 1 ?
How many Sft of Level Plaster per Kg
what is the water cement ratio for plastering
what is BPM in concrete demolition hammers. what is better a higher value or lower
What is meant by scaffolding coefficient?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
how gradation of aggregates effect on slump of fresh concrete?