Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the Gap Should maintain for HT cables crossing of
LT Cable?

Answer Posted / rajiv

the gap should be bear minimum 300mm from both cable trays
and these are not crossed and if required then the angle
should be of 90 degree.

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CALCULATE THE VT SIZING?

3052


what happens to the water pump if ground water level is slowly decreasing?our water pump is varying from no-load full-load due to this problem

1628


What do you understand by external characteristics of a d.c. Generator?

1062


Do Phase angle measurement have any application in freq/harmonics measurement? If so how?

1889


How Can You Relate Power Engineering With Electrical Engineering?

1173


Atwhat condition reverse power relay will act?

2214


How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?

2207


The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?

2284


Why does the rotor rotate?

2206


How many Zones can be in Conventional type fire alarm system & how can we detect the fire in Conv. type FAS?

1785


Tell me about ur past electrical maintanence job

1841


How to synchoronize the generator (with gcb,GT) to grid????? ????? from Grid iam getting power (rated 400kv/20kv) through GT and its goes to UAT.,,ST.,, now my generator(rated 20kv ) ready.,, now iam closing my GCB.,, in GT iam suddenly giving 20kv on that Gt.,, what will happend

2016


i ha done my 10th with 71% ,ITI with 81% 11th with 75% 12th 43% apprentiship with 71% in SAT i secure 1390 ,TOEFL 27 i was refused four times and in all me interview visa officar told that i am not Qualify for study in USA but i completed my 12th yes i got low persentage in my 12th but i seen to much student they already got visa with them 3 or 4 backlocs so why they are refused me ?

3391


is there any chart showing the suitable cable size according to AMP and length ? for three phase motors

1354


how to calculate units consumption for a 12 hp motor /hr.

1420