define prestressing? compare prestressing with post
tensioning?
Answer Posted / santhoshselvamani
pre stressing means before concrete we was stressing the
cable(tendons)
post tensioning means afterporing the concrete we will
stressing the tentons,
pretension mainly usedfor bridges
post tension mainly used for buildings
Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
difference between trapezoidal and pedestal footing and how the load acts on that
How much cement and sand required for 9"brick wall per square metre
States some of the commonly used commands in cad software’s?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
What is the biggest dam in america?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
how to calculate the strength of rebound hammer test reading in building construction ?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What type of tensile strength is handling by crank in beam? Thanks.
Define What is aggregate?
how can we calculate steel value, depending on load
How to calculate unit weight of concrete for m40 grade.
What is difference between engineering stress and true stress?
Can we use the flyash bricks in brick bat coba?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8