Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

define prestressing? compare prestressing with post
tensioning?

Answer Posted / santhoshselvamani

pre stressing means before concrete we was stressing the
cable(tendons)

post tensioning means afterporing the concrete we will
stressing the tentons,

pretension mainly usedfor bridges

post tension mainly used for buildings

Is This Answer Correct ?    14 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1840


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3072


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

2503


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2697


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1734


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

2112


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2226


How can you distinguish between sorption, absorption and adsorption?

1118


how many BSCs can i connect to the HUAWEI MSC

2257


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2941


Who name us Engineer & Why?

2454


Define block?

1122


The portion of a brick cut across the width is called?

1487


What applicable rate of wct in bihar

1792


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2295