define prestressing? compare prestressing with post
tensioning?
Answer Posted / santhoshselvamani
pre stressing means before concrete we was stressing the
cable(tendons)
post tensioning means afterporing the concrete we will
stressing the tentons,
pretension mainly usedfor bridges
post tension mainly used for buildings
| Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
How can you distinguish between sorption, absorption and adsorption?
how many BSCs can i connect to the HUAWEI MSC
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
Who name us Engineer & Why?
Define block?
The portion of a brick cut across the width is called?
What applicable rate of wct in bihar
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?