Answer Posted / sankara rao
i am sankar. i completed degree i am looding for acting
chance if any t.v.or cenema. manasulo anukunte alagaina
saadhinchavachu.first we have intrest that field. show ur
talent in your own style.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what is the types of surveying?which type of survey carrying for type of work?
rate analysis hiring of generator 62.5 KVA
use ofr concrete as per grade ?
what is the basic difference between Coloumn & Shear Wall
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the dimensions of river sand truck trailer or trolly ?
what is the calculation of raw material for 0.35cum of m-15
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is the design procedure for building
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How much for the BRC lapping in full yield and half yield < and which table to get it ?
can you give me the details of rate analysis of steel and concrete?