Answer Posted / a.k. max
if the portland cement density is 1505kg/cu.m. then in 1
cu.m. we will have 1505kg of cement. as a result in 1cu.m.
we have 1505/50=30.1 bags
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
How do you calculate reinforcement weight of steel?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Tell me about triple point of water.
In block work seawalls what is the purpose of slip joints?
how many litres of enamel paint required for 5000 sft of site??
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
How to calculate paint drums per meter square
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
what is called Bulk Density of aggregate?
What you understand by building codes?
What is Base Shear ?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?