Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is let through energy of mccb

Answer Posted / matt

Let through energy is the amount of energy that will be let though in a short circuit condition. The let through energy (I^2t) is calculated from the fault clearing time and the trip multiplier, which is obtained from the MCCB manufacturer. Let through energy is useful in sizing downstream cables.

Is This Answer Correct ?    25 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to enter inverter parameter? without manaual?

2082


Define delay time.

1140


WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??

2279


Explain the fundamental difference between emf (electro motive force) and pd (potential difference) ?

1202


A ray hit a smooth regular surface at an angle of 20 from the normal. Calculate : 1. The angle btw the incident and reflection ray. 2. The angle of deviation.

1988


what is difference between cpp electrical system and refinery electrical system

2355


What are the classifications of oscillators?

1138


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1159


operation of protection relay watchdog contact?

2457


how you configure motorvision relay (L&T make)from DCS

4961


how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?

2922


If a high resistance fault occurs,then what are the changes will happen in the system?

1521


i need previous entrence exam papers of nhpc.

2894


what do you mean by every IC 74 first digit.why are you using this no.why not using another no.

1948


why do we use 25kv supply for traction purpose?

1969