With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Please let me know what is the simplest way of Calculating Mix Designs
How many % we consider for lap for reinforcement for estimates
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What is an ice dam sock?
what will be price of 1:2:4pcc per kg?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
"Gates of the dams are generally designed of curved shape". Why?
Which is the direction for positive angle?
how much cement and sand required for 1cum rr masonry
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
how to find ssm in foundation?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
I what know about life time of frp tank plz explain about it specifications & other details
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day