Answer Posted / g.prashanth
to show your performance and also you have the money
sir my name is g prashanth
s/o shrishylam
my contact number is 9652172757
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is Short bored pile foundation.
What is thumb rule in quantity and cost estimation of a residential building?
What is the absolute pressure scale?
Explain the importance of moment of inertia?
How much cement is require in one sqft area in a G+3 residential construction.
What is the Unit weight of coarse sand (F.M- 2.20) ?????
i want texture painting pwd data
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What is rate of concrete surface rendering work per sqm
how pumping of concrete effects the quantity of material used in it?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is the Maximum %age of Steel in columns and beams ?
door and window wood work calculations and different methods
Define the various stages of the project planning process in construction.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm