Answer Posted / ashvin
1) Minor Bridge
2)Major bridge
3) Cable stay bridge
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
What is the different type of slump test indications?
how i get all type of short type question answer about civil engg
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What is meant by engineering drawing?
Explain what is progress payment?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What does a construction cost covers and what does not?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Define What happens to Load at yielding ?
can i get hindi version of is codes based on civil engineering?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?