Answer Posted / nilkanth tailor
Basically, we used ferromagentic material in core...when
magnetic flux linked with thid core..thier is some
physically expand and contract slightly with each cycle of
the magnetic field...and that effect known as
magnetostriction..(Magnetostriction is a property of
ferromagnetic materials that causes them to change their
shape or dimensions during the process of magnetization...
it was first identified in 1842 by James Joule when
observing a sample of nickel)...due to this effect causes
fluctuating forces between the primary and secondary
windings. These incite vibrations within nearby metalwork,
adding to the humming noise, and consuming a small amount
of power.
| Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
Why wind turbines wheels rotate constantly
various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.
how we can come to know that motor winding resistance which showing by DMM is right or wrong???is there any chart or something that we will compare & check???
Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics
What do you understand by avr?
Define the term factor of inertia.
what about GD square and its important for motor design?
how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
What is the differance between 2 dc motors of armature voltage 660 v and 440 v?
how diside ct mf exmp.200/5 ct
Determine a suitable number of slors and conductors per slot for the starter 1 winding of a 3 phase, 3300 V. SO Hz 300 rpm alternator. The diameter is 2.3 m
Why increase in current leads to increase in conductor temperature?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
redundant connection in contactor?