Why we have short circuit the secondary of the transformer
Answer Posted / vshnu
that is l.v side,
at h.v side current is less and voltage is high
but l.v side voltage is less and currents is high
in order to get current rated we have to short circuit the l.v terminals by applying less than rated voltage at h.v side.
the small amount of voltage at h.v side is enough to produce rated current at l.v side so that test is conducted on l.v side only,
the small amount of voltage at l.v side not able to produce
rated current at h.v so we are not short circuiting h.v side
refer p.s bimbra book
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
define displacement & magnitude ?
Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?
control & auxilary circuits used for circuir breakers
hi,every one, i have to write the search paper on "performance policy optimization" of NGN (next generation networks). i need the material on this topic. can any body help me. please tell me any useful site where the good material is available and name of any reference book. it should be a great help for me.
WHAT IS LOAD CELL
Why field rheostat is kept in minimum position?
how is find out kwh step by step
How does an oscillator differ from an amplifier?
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?
Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT?
What is VSCF windelectrical system?
what are the pecularity of shaver sockets ?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
What is the Load Capacity of Panther conductor (0.2) and dog conductor (0.2)
What is sink and source?