Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we have short circuit the secondary of the transformer

Answer Posted / vshnu

that is l.v side,
at h.v side current is less and voltage is high
but l.v side voltage is less and currents is high
in order to get current rated we have to short circuit the l.v terminals by applying less than rated voltage at h.v side.
the small amount of voltage at h.v side is enough to produce rated current at l.v side so that test is conducted on l.v side only,
the small amount of voltage at l.v side not able to produce
rated current at h.v so we are not short circuiting h.v side
refer p.s bimbra book

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

define displacement & magnitude ?

1884


Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?

2001


control & auxilary circuits used for circuir breakers

1938


hi,every one, i have to write the search paper on "performance policy optimization" of NGN (next generation networks). i need the material on this topic. can any body help me. please tell me any useful site where the good material is available and name of any reference book. it should be a great help for me.

1972


WHAT IS LOAD CELL

2196


Why field rheostat is kept in minimum position?

1319


how is find out kwh step by step

1834


How does an oscillator differ from an amplifier?

1209


what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?

2260


Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT? 

2001


What is VSCF windelectrical system?

1983


what are the pecularity of shaver sockets ?

1965


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2082


What is the Load Capacity of Panther conductor (0.2) and dog conductor (0.2) 

2880


What is sink and source?

1249