Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we have short circuit the secondary of the transformer

Answer Posted / vshnu

that is l.v side,
at h.v side current is less and voltage is high
but l.v side voltage is less and currents is high
in order to get current rated we have to short circuit the l.v terminals by applying less than rated voltage at h.v side.
the small amount of voltage at h.v side is enough to produce rated current at l.v side so that test is conducted on l.v side only,
the small amount of voltage at l.v side not able to produce
rated current at h.v so we are not short circuiting h.v side
refer p.s bimbra book

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What OPGW is better than Microwave or PLCC???

4116


why various test are performed on electrical panels & power cables before commissioning on site & what are these test???

1974


What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?

1939


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2215


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1800


Please define ampere?

1101


what is the series parallel connection of capacitors? and how can we use these application in three phase motors for controlling torque?

2081


what is buffer resistance starter.?.What is the working principle and where it is used..?

2020


How to calculate the input cable rating for 10kva ups (3phase input and single phase output and also 3phase output, battery rating 65Ah)provide the formula also.thnx

2196


why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)

1885


HOW TO TEST A LIGHTENING ARREST ER ?

2189


I need the list of Universities who have summer intake for BS degree in Electrical Engineering.?

2025


i need the details about bhel exam.how to apply for that.please send to my email-id.thenmozhi2k7@gmail.com

1995


formula for calculation of switchgears(i.e. contactor, fuse, cb, relay etc.), if load current is given?

2187


What is the difference between the relay and the circuit breaker?

1110