Which one is the main bar in a square slab (2m x 2m)
Answer Posted / narmadha
Both top and bottom bars
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
cause of cylinder test failure
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What is the meaning of a blue land surveyors flag?
(Project Management Topic) What are the important criteria in the successful realization of the project?
what is meant by shear center?????
Which is the direction of negative angle?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How to construct a water sump in a rocky soil?
what is tension footing?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how to check and keep control on the wastage of material at site
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Pls explain me about tension and compression in a flat slab
What are the applications of the modulus of elasticity?