why do we provide haunch for drains and culverts?
Answer Posted / sjtbehera
to cast slab at top
| Is This Answer Correct ? | 2 Yes | 19 No |
Post New Answer View All Answers
What are the basic use of runners and standards of pipelines?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Forces in a Shear Wall are in plane or out of plane ?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How you can use different dimension tools in cad? What are the different dimensions available?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Define What materials were used to build the Golden Gate Bridge?
How to calculate unit weight of concrete for m40 grade.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?