Answer Posted / sjtbehera
face bar provoided when a beam depth exceed 750mm. it
resist the shaer develop in side face of beam
| Is This Answer Correct ? | 34 Yes | 5 No |
Post New Answer View All Answers
What is the cost difference between site mix and ready mix concrete per cubic meter
in 100 cft = 1350 bricks in 100 cft = ? bloks
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
how many tonnes equals to one cubic feet?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
I need model question papers for writing the Dubai municipality exam,for G+1
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what is mean by reestimation?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
what is the construction cost for per cft of multistorryed building in kolkata?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Give me an example of a time when something you tried to accomplish and failed.
What are the phases inspections are done by local authority while construction?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.