Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much wastage we considered for cement

Answer Posted / sjtbehera

incase of cement-3%

reinforcement above 20mm-5%

20mm and below-2.5%

Is This Answer Correct ?    27 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is basic cost of the material includes tax?

2100


How long does it take concrete to harden?

1158


How to arrive dry volume of concrete (1.52 to 1.57) ?

2341


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

2267


What is the difference between Grade I, II and III of GSB?

2642


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

1130


which method is used in semi-rigid connection design??

2270


why demand factor less then 1 ?

2180


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2445


why do we provide haunches in rcc box or underpasses?

3005


What are the advantages of cad?

1097


What is quantity of cement and sand required for 2000sqft of tiling?

2844


How to do base isolation for RC framed structure using ETABS software?

4191


pls give me ans to ACT formula cube testing porpuse

3070


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1545