1. why more stirrups are provided near the support?
2.where more stirrups is provided in a column and why?
3.why extra bars are provided at the top of beam?
4.what is the difference between overlap and lap lenght?
5.what is development lenght

Answer Posted / rakesh katkar

1 Because its junction where shear force is max & faliure
in case of earthquake

2 at the junction at L/2 zone where there are chances of
faliure

3 to counteract the max BM at the top

4 Overlap : itis the portion ofthe bar which is prolonged
at the otherside of the bar
Laplengh : it is the req distance of a bar to be joint
when there is shortage of total lenght

5 Development Length : It is the length where the bar ends
And it is caculated by Ost/4toubd

Is This Answer Correct ?    21 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Formula of area of crane hook

1519


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1090


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2503


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2733


how to do cementicious paint for rcc walls of cw pump house

1538






Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1377


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2232


whats is difference between anchorage length and development length

1368


How did street originate in the plumbing term street ell?

623


What are the common ways of demolition?

713


to minimize budget cost of building , what can i do

1656


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1473


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2110


what is the difference between np2 and np3 concrete mix

1549


Why are pull-out tests performed for soil nails?

747