Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Whether the DP transmitter can be utilised in the medium of
Vaccum for the measurement of Level?

Answer Posted / sankarithi

Hi Friends i finally succeeded to take the DP transmitter
into line for the Measurement of Level which is under
vaccum. The following steps to be followed.
1. Transmitter range should be in Positive side only.
2. Transmitter HP should be connected with the Level
chamber bottom side and maintain very less gap between
Level Chamber and Trasmitter HP end.
3. Connect Transmitter LP end with the Level Chamber Top
End and elevate the Pipe line 11/2 mtr above the tank level
in order to ensure that there will not any water entrance
into the LP side impulse line. We need to maintain LP side
without water.
4. All Joints should be tight and there will not be any
leakages.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we r opening HOT BYPASS valve during startup of a compressor?

2160


In control valve proximity inductive sensor is taken as digital feedback for full open and full close.Normally its volts 24v when the sensor acts the feed back voltage 14v so that our relay not indicating in plc panel . kindly give the solution.

2019


Q- Control problem are mainly classified in _____ types. a-)4 b-)3 c-)6 d-)nono of these Few of them i know is 1- regulator type problem (eg- Air conditioner) 2- tracking problem (eg missile trcking problem) 3- sybernatics 4- optimal control problem

2175


what is the calibration procedure for magnetic flow meter @ onsite

1703


how u calibrate pneumatic n motorized c/v?

2010


how will you segregate the alarm levels in alarm management system during factory Acceptance Test

2442


what is temperature compensation?

5526


how to design orifice plate?what is the equation?

2100


selection criteria of control valve? and selection criteria of actuator explain in brief?

4127


What is mean by analytical instrumentation?

1882


Q- What are the application in which PNP transistor is preferred over NPN ?

3391


Tell about your IFFCO plant visit.

2129


all types instrumentation questions want

2235


Hi Friends i am going to write BARC written test by this month 20th (20-5-2008). So please if any body knows the details about this or having previous question papers pls mail me to kkumarei@gmail.com. For Suggestions give one message to 9962122264

2449


What is instrumentation instrumentation engineering?

1165