Answer Posted / bala.a
if we have two no of D.G Sets u can take supply seperately
with help of buscoupler in open condition and also u can
take combination supply with help of buscoupler closed
condition in a single panel
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
can someone explain that how the speed of the protection system affects the fault level calculation?
What is notching in dc machine?
what are the interview question asked in wind mill about electrical
At what factor resistance r of a conductor depends?
why should the primary of transformer be connected in delta in a heat run test?
what is the meaning of number in (11, 31, 61,14, etc. CDG11, CDG31, CDG61, DDT32
Is there any rule to select the voltage of motor based on KW rating? What is the rating above which lt motor becomes the HT motor?.
What OPGW is better than Microwave or PLCC???
How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V
one split ac how can told of this ac which Tr tell me us
if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?
11 kv input, 66 kv input advantages
Why we find the sensitivity for the CT's to check?
Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?