how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?
Answer Posted / deepak arya
3.5 cum
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
What is Critical path in Ms-Project ?
How to calculate quantity of plum masonry in 1:3:7
what is the max. area can we apply the plate load test ?
important question on stones
Moisture content calculation for diff mix ratio's ??
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
pls tell me about method of cutting length of ties column
How to find CN by using arcgis 9.3?
how we calculate the vol.of wet concrete..?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Slump Values for works?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
what is flexible and rigid footing?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??