what is diffrence b/w -48vdc and +48vdc ?

Answer Posted / sakthivel

in telecommunication tower network we use -48 volts and + 48
volts and -48cvolt are main power supply in communication
field

Is This Answer Correct ?    0 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Where burned of electricity,when,who, & why.

1501


300m long and 30kw inductive loade 3phase supply how many size cable required

996


what are the different kind of cables used for transmissions?

712


WHY EXCITER PHASE SEQUENCE ARE OPPOSITE THAN STATOR SUPPLY PHASE SEQUENCE IN SYNCHRONOUS MOTOR >

1434


1. what is usage for power factor in industries?? 2.why we need to monitor power factor??

6690






DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT

5013


Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?

1598


What is error of a measurement?

616


How to select the proper VSD to operate high inertial load

1273


How can we convert 11 kv to 440 volt without using transformer ?

975


What are the causes for the failures of sandwich type (Al) busducts?

1419


TRAFO 1. WHY BREATHER IS USED. 2. WHY OIL GOES DOWN IN CONSERVATOR TANK. 3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF TRANSFORMER. 4. HOW TO CHECK IR VALUE OF TRANSFORMER. 5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM. 6. OFF LOAD TAP CHANGER OPERATION PROCEDURE. 7. TR. SHUTDOWN / ISOLATION PROCEDURE. 8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO. 9. WHY TR. HAS OLTC IN HV SIDE. 10. WHAT IS % IMPEDANCE. 11. WHY TR. RATING IN MVA. 12. WHAT IS VECTOR GROUP IN TR. 13. CONDITION FOR PARALLEL OPERATION OF TRS. 14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE. 15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT YOU WILL DO. 16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP. PROTECTION 17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR. 18. DIFFERENT TYPES OF FAULTS IN TR. Trafo - Page-1 of 2 19. WHAT HAPPENS WHEN TR. CHARGED FROM LV. 20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO BETWEEN LV WINDING AND EARTH. 21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND OLTC TANK. 22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK 23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE. 24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER. 25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN POWER TR. 26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE. 27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION DURING MAINTENANCE. Trafo - Page 2 of 2

1995


How to test the Secure Elite 440 Multi function meter working condition.

1604


Which type of DG need Netral Earthing?

4494


What are the specifications for conducting earth leakage test as per IEC standard?

1507