Answer Posted / subhakant / bhajahari
NGR MEANS NEUTRAL GROUNDING WITH RESISTANCE. THE PURPOSE OF
USING NGR FOR NEUTRAL GROUNDING IS TO LIMIT THE FAULT
CURRENT WITHIN THE OPERATING RANGE OF PROTECTING EQUIPMENTS
AND ALSO TO SENSE THE SYSTEM UNBALANCE CURRENT
Is This Answer Correct ? | 48 Yes | 5 No |
Post New Answer View All Answers
How to test Alternator stability test for REF relay
In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]
When we giving the 3 phase supply to ups system how to coming netural?
What does bode plots shows?
HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS
we use capister for power factor. when we use capaciter in dg circuit than defect dg. can we use capaciter bank for dg circuit
2. Modify your design in question 1.a so that the circuit works according to the following function table X Y F 0 0 Clear 0 1 No Change 1 0 Parallel Loading 1 1 Count 3. Design a circuit that detects the pattern 010 in a serial input X considering: 3.a Overlapping 3.b No overlapping
How the annunciator works ? How to do its wiring
How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?
lenz law application and define
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
what are the major & minor faults that occur in an inverter and in UPS ? And how to repair and resolve them ?
why sometime we get electrical shock while touching the ballon of dish tv connection ? which we should not get.
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?