Answer Posted / sjtbehera
the basic fundamental of conturing is to know level of
ground. is it a valley, slope, river, or hilly area.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the difference between absorption & adsorption and sorption?
Define What happens to Load at yielding ?
what is polity
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what's the formula for calculate pcc for matt(45mm aggregate)?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is escalation?how it is done?
Explain the difference between shear and tensile strength.
What things architect have to take care of before starting any project?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
what is the ingredient value of 40mm and 20mm aggregates?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?