Answer Posted / aashish
Step:
1.Define objective e.g. if temperature of heater goes
beyond 200 degree celcius the fan made on untill
temperature reaches 150degree celcious.
2. then the given objective is converted in programm by
using set of instruction it may be Plc programming language
s5 or s7 in Ladder logic or STL
3. install program into plc using required input from
module.
4.then start plc it works as per instruction.
5.Requred to connect plc output to field contactar,
6.connect sensor feedback to plc system.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in
Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent
Linear amplifier.
why we are not using the turbine flow meter in the steam service?
centrifugal compressor interlock? Tell me the parameter at which compressor will trip
Hi Friends i need Electronics&Instrumentation Engg question papers for BARC written test by coming 20th May 2008 pls post ur use full info to kkumarei@gmail.com. Or for suggestions pls give one missed call to 9962122264
what does the ratio 800-400-300-200/1-1-1-1-1 in the specification of current transformer indicates?
how works encoder in plc
what is the field bus calble ? what are diffrences in orang colur cable and black coular calble ?
how can be calibrate flow indication transmitter (rosemount) it shows excess milli amps nearly about 24 ma on full scale, but its scale was set on 20ma on full scale..???how can be simiulate..???
What are the application of bernoulli’s theorem?
What is the purpose of LO Overhead tank in turbines.
Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.
protection relay watchdog contact operation?
How process line mpm calculation is done?