what are the types of flow? what is terbulent flow?
Answer Posted / wasem rakkasgi
steady flow un steady flow, laminar n tubolent flow,
uniform n non uniform flow.
terbulent flow means which is having mannings num greater
then 1
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many BSCs can i connect to the HUAWEI MSC
How you can turn off the display for dimension in CAD?
What is thumb rule for deep trench excavation
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What is the use of water table & Kreb stone for drain
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Explain the latest method to detect a crack in a building?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How to calculate woden area in sft and Cft
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
how to calculate rate analysys of 1:6 plastering 10 sq m
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?