Answer Posted / md.abdul majeed
IN PLC(PROGRAMMABLE AND LOGIC CONTROLLER)ONLY FEW ANALOG
SIGNAL ARE TESTED,WHERE ELSE USING DCS(DISTRIBUTED CONTROL
SYSTEM)WE CAN TEST MORE AND MORE ANALOG SIGNALS.
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
what is compensation? temprature & pressure
why we use 3 wire rtd direct wiring for temperature measurement instead of temperature transmitter like bearing temperature
sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.
How many interlocks at turbine? Plz explain briefly
Explain pH, Conductivity.
What is Span Error
I have a Control VAlve having size of 2 ".Only the known parameter is Pressure drop . Its 2 Kg. Then How to calculate control valve sizing means Cv.
Explain bernoulli’s theorem.
How to Calibrate Vortex Flow transmitter in field
What are the maximum packet size of: a) HART b) Profibus DP c)Profibus PA d) DeviceNet e) Foundation Fieldbus
What is zone,loop/fire alarm system?
I want to know the questions asked in ONGC interview(after being selected in the written exam) for Instrumentation branch.Kindly help.
1.what is controller proportional gain 2.what is the controller intergral action time. 3.A proportional plus derivative controller that has a proportional band of 20% and a derivative action time of 0.1 minutes. Construct the shape of the output waveform for the triangular input if the input rises and falls at the rate of 4 units per minute.
If fire would be inside the plant which fire detector is to detected the fire.
PLEASE PROVIDE SAMPLES OF CHEVRON SKILL TESTS