what is the difference between built-up area & carpet area?
how to calculate this areas?as there are any formula to
calculate these areas?
Answer Posted / k.jayavijayan
The term `Plinth Area'( Built-up Area) refers to the entire
carpet area along with the thickness of the external walls
of the apartment. It obviously includes the thickness of
the internal walls and the columns, if any, lying within
the four walls of an apartment. The commercial space is not
taken into account in calculating the plinth area.
The term `Carpet Area' refers to the total usable area
within the four walls of an apartment or a commercial
space, as the case may be. In other words, it refers to
the area for which a carpet can be laid if required by the
owners.
and finally the term `Super Built-up Area' refers to the
plinth area of an apartment or a commercial unit as added
by the balconies and other common areas like corridors,
staircase, lift room, motor room, security room, meeting
hall, gymnasium and an area reserved for indoor games.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
In reclamation works what are the importance of geotextiles and sand?
In cement making,what is meaning of blend,fineness,density.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
how much used soil in 1 brick of standard size?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what is mean by reestimation?
How does siphoning work?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
what is directivity effect?
how lap length is increased with increase of Grade of steel?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
dialation means