Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between Extruded and Expanded
Polystyrene Sheets?

Answer Posted / laukik patil

XPS vs EPS difference
Which leads us to the most important difference between
these two insulation styrofoams and it is that the extruded
polystyrene insulation (XPS) cellular structure is closed.
Therefor the XPS doesn´t absorb water, it´s capilarity is
very low and also it´s thermal conductivity is much lower
than of EPS. Based on the above properties of extruded
polystyrene, it is mostly used when constructing the roofs
with the reverse order of insulation layers.
Advantages of extruded polystyrene foam
- has no impact on people´s health; - extruded polystyrene
insulation installation is very easy; - can be molded or any
other way shaped; - waterproof and resistant against all in
water dissolvable stuff.
Disadvantages of extruded polystyrene insulation
- the foam polystyrene insulation is not resistant against
organic solvents and therefor cannot be used in combination
with MPVC hydro-insulation foils. The XPS segments usually
are covered on its face side with the 1 cm plast cemet layer
that serves as the protection and stabilsation layer.

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is command line?

1185


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

2027


how to take concrete quantity for precast segment for viaduct project?

3101


How to calculate woden area in sft and Cft

1581


Define What is diversion tunnel in a dam?

1285


What quantity of 1.0 m3 bricks required?

1142


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

2162


What is modular elasticity?

1175


How to come 1.54 from dry to wet concrete? 

2263


why do we not deduct volume of steel to find actual volume of concrete in practical???

1803


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2422


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1745


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1909


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3453


What are the advantages and disadvantages of using plastic and timber fenders?

1156