what is the process of repair the structure in whitch
reinforcement is open

Answer Posted / balamurugan

simply filled with cement mortor in 1:2 ratio in honeicombes without caveges

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1555


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1209


what is the most suitable foundation when construct a bird watching tower in a marshy land

1423


What is proportion of PCC Grade G?

1598


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2425






how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1918


Explain moment of inertia and its importance.

655


types of piles detail,

1815


How to estabilish reinforcement Steel rolling margin for a building projects ?

3646


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

1488


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1653


What is alternate bid?

711


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1627


How to calculate unit weight of concrete for m40 grade.

3435


What is the withdrawal force of steel nails?

673