what is the Analog signal and what is the Digital signal
Answer Posted / s.jayaram
Digital signal is nothing but voltage state is 1 or 0
whereas Analog signal is voltage, current, frequency varies.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to calibrate Magnetic flow Transmitter in Field
where uses EXe /EXd/Exo/Exn/Exp/Exq/EXia
Explain the working of an enraf level gauge.
detail of mass flow meter pricipal
What are advantages and disadvantage of the ac supply load cell?
dear friends, i have seen flow as the selection critriea in presure guage (bourdon tube) and i would like to know what is the relation between flow and performance of pressure guage other parameters i found in the data sheet are pressure max. 1ksc temperature max. - 50 deg c line size - 80NB operating range - 1ksc pr. guage range - 0-2 ksc thank u,
How to calibrate an pressure gauge with yantrika test bench?
how u choose thermowell lenght n pnumatic C/v size?
What is zero elevation and zero suppression?
what is SIL 1 2 3
What are the application of bernoulli’s theorem?
Programmable Logic control.
what is stroke check for field instument transmetter's & AOV's
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
In power plant to measure vibration of a turbine we install sensors. Before install this sensor we have to set gap voltage. What is meant by gap voltage and its use?